Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13599863
| No.13599863
- Product Categories
- Friendly Links
| Information Name: | Move the slag, slag machines, mining machines installed |
| Published: | 2015-05-14 |
| Validity: | 0 |
| Specifications: | Any |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | This series of vertical claw backhoe loaders (common name: Grilled ballast machine), is based on our iron ore, lead and zinc, molybdenum, phosphate and other minerals mining loading and design, it applies to more than 2m × 2m mined or roadway, for defense, mining, railway, water conservancy and hydropower construction sector driving the loading operation. It is power (18.5kw) quality of the slag, low fuel consumption, power saving save, loading speed; hydraulic and electric elements in all domestic manufacturers of brand-name products, reliable performance. Especially the use of dual power inclined slag machine, electricity, oil is very convenient Pa ore slag machine, due to the good performance, high efficiency, and can effectively in caves, hills load a variety of slag for non-coal mine gas. Gongyi City Xinhua Machinery Factory Cinder machine new machine Running Notes: First, the new machine Running Notes: 1, the new machine running-in period requirements: Li claw excavator life and the early use of a great relationship, engine undercarriages and hydraulic systems have a running-in process slag machine, to improve the life of the machine at the beginning of the new machines use (excavation work 50 hours) should strictly adhere to the following requirements: 1) The preparation before the run: (1) Check each machine component connection is firmly installed. (2) the attachment is complete. (3) damage. (4) Check the oil spill all loose fittings. (5) Check the tire pressure is normal. (6) Check the vehicle brake situation. (7) Check motors, diesel engines, hydraulic pumps, hydraulic motors without exception. (8) required to add fuel, hydraulic oil, check the brake fluid. (9) Check the battery electrolyte and battery connections. 2) run-run-run load content from 70% to 80% of rated, engine speed not less than 1200 rev / min. Run-in including mining haul, walking, climbing, and all the action. 2, after the run is completed: (1) Replace the engine, drive axle lubricants and hydraulic system hydraulic oil and clean the tank, clean the filter, replace precipitated lubricants and hydraulic oils; check brake fluid. (2) conduct a maintenance level (see the contents of a guarantee). (3) hydraulic system replacement after 500 hours of hydraulic oil. Move the slag, slag machines, mining machines installed by Xinhua Machinery Factory of Gongyi City. Gongyi City Xinhua Machinery Factory (www.gyxinhua.com) strong, credible, in Zhengzhou, Henan handling equipment industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Xinhua machinery into the brilliant and you work for a better future! |
Admin>>>
You are the 26344 visitor
Copyright © GuangDong ICP No. 10089450, Xinhua Machinery Factory of Gongyi City All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 26344 visitor
Copyright © GuangDong ICP No. 10089450, Xinhua Machinery Factory of Gongyi City All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

